Deye WS-GS2000-2H3
1MW/2057kWh utility-scale ESS in 20ft container with integrated PCS, MPPT, and dual fire protection.
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | WS-GS2000-2H3 |
|---|---|
| PV String Input Data | |
| Max PV Input Power | 1.6 W |
| Max PV Input / Array Open Circuit Voltage | 800Vdc |
| Max PV Input Current | 8×(40+40+40+40+40+40+40+40)A |
| MPPT Voltage Range | 180-750Vdc |
| MPPT Voltage Range at Full Load | 450-750Vdc |
| Start-up Voltage | 200Vdc |
| Max PV Short-Circuit Current | 8×(60+60+60+60+60+60+60+60)A |
| MPPT Nominal Voltage | 600Vdc |
| Electrical / AC Output Data | |
| Max Efficiency | >99% |
| AC Grid Connection Type | 3L+N+PE |
| Nominal Voltage | 819.2 V |
| Overload Capability | 1.1x/1.5x |
| Adjustable Power Factor Range | 0.8 leading-0.8lagging |
| Battery Data | |
| Battery Energy Capacity | 2057 kWh |
| Nominal Capacity | 314Ah |
| Round-Trip Efficiency | 88.50% |
| Battery Type / Chemistry | LiFePO₄ |
| Battery Voltage Range | 819.2Vdc(691.2~921.6Vdc) |
| Cycle Life | 8,000 (70% EOL) cycles |
| Cell / Pack Configuration | 1P16S |
| Protection Features | |
| IP Rating | IP54 (C4-M) |
| Mechanical Data | |
| Cooling | Air cooling |
| Design / Form Factor | Floor mount |
| Dimensions | 20ft (HC) mm |
| Operating Conditions | |
| Max Altitude | 3000m |
| Operating Temperature | -20 to 50 °C |
| Relative Humidity | 0 ~ 90% |
| Storage Temperature Range | -20~60 °C |
| Communication | |
| Communication Interface | RJ45 |
| Communication Protocol | Modbus TCP,IEC104,IEC61850 |
Note: Specifications are based on the official Deye WS-GS2000-2H3 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in Lebanon
| Market | Lebanon |
| Grid authority / regulator | EDL Lebanon |
| Quotation currency | LBP |
| Support hours timezone | Asia/Beirut |
| Delivery & installation coverage | Beirut, Tripoli, Sidon |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Lebanon that is EDL Lebanon. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Key Features & Technical Highlights
- 1MW PCS: Megawatt-scale power
- 2057kWh Energy: Massive storage capacity
- Dual Fire Protection: Gas + water systems
- Smart Cloud: 24/7 O&M, custom algorithms
- 420kW DC Charge: Fast EV charging support
- 20ft Container: Turnkey solution
Frequently Asked Questions
Is the DEYE WS-GS2000-2H3 suitable for hot climates like the Gulf?
Yes. The WS-GS2000-2H3 uses LiFePO4 chemistry with a BMS and thermal management designed to operate safely in the high ambient temperatures common across the Middle East and Africa.
What applications is this suitable for?
The WS-GS2000-2H3 is ideal for utility-scale applications including black start, off-grid operation/backup, peak shaving, transformer capacity control, virtual power plants, and EV charging infrastructure.
What fire protection does it have?
The system features 2-hour fire resistance with dual protection: combustible gas detection, smoke evacuation, aerosol extinguishers, and water sprinklers for comprehensive fire safety.